If you run a trade business in Orlando, you already have a feel for where the work is. Everyone carries a list of busy areas in their head. But a feel is last year’s information, and the city moves faster than that.
This page replaces the feel with a count of building permits in Orlando, FL, neighborhood by neighborhood. Each chart below is built from the City of Orlando’s permit records at the moment you open it, so it is always the last 30 days, never a stale report. Bookmark it and check back.
- leads: permits filed plus permits finished
- 908
- in stated job value
- $61,174,247
- neighborhoods with at least one
- 93
City of Orlando permit records, Oct 30 to Nov 29, 2026.
How to read these charts
Three things to keep in mind before you draw conclusions from any chart below.
A permit is counted when the city acts on it. Either the application was processed in the last 30 days (we call that “filed”), or the permit was closed as finished in the last 30 days. In the neighborhood charts, a job that started and finished inside the same month is counted once, not twice.
Bigger neighborhoods have more permits. These are raw counts, not rates. A neighborhood with five thousand homes will usually beat one with five hundred. That is fine if you are deciding where to send a truck, because you care about how much work there is. It is misleading if you are trying to say one area is “hotter” than another.
Small numbers jump around. A neighborhood with 120 permits is unlikely to swing wildly next month. One with four might have nine or none. Trust the top of each chart more than the bottom, and trust the roofs chart, which has the most permits behind it, more than the pools one.
The busiest neighborhoods overall
First, everything added together: pools, roofs, new homes, fences, remodels and AC replacements on one- and two-family homes. Open “See the split by trade” under the chart for the full table.
See the split by trade
| Neighborhood | Pools | Roofs | New homes | Fences | Remodels | AC replacements | Total |
|---|---|---|---|---|---|---|---|
| Lake Nona South | 10 | 15 | 71 | 5 | 12 | 7 | 120 |
| College Park | 7 | 30 | 10 | 7 | 4 | 14 | 72 |
| Vista Park | 1 | 37 | 32 | 1 | 0 | 0 | 71 |
| Meridian Park | 1 | 30 | 30 | 0 | 2 | 0 | 63 |
| Baldwin Park | 1 | 4 | 0 | 0 | 5 | 15 | 25 |
| Colonialtown North | 3 | 5 | 5 | 1 | 2 | 8 | 24 |
| Southeastern Oaks | 3 | 10 | 9 | 0 | 1 | 0 | 23 |
| Lake Como | 0 | 8 | 0 | 2 | 4 | 4 | 18 |
| Engelwood Park | 0 | 7 | 0 | 2 | 1 | 6 | 16 |
| Colonialtown South | 1 | 9 | 0 | 1 | 2 | 1 | 14 |
| Vista East | 1 | 4 | 0 | 0 | 3 | 6 | 14 |
| Airport North | 0 | 12 | 1 | 0 | 0 | 0 | 13 |
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Read this as a map of where homeowners are spending. A neighborhood near the top is not just good for one trade. A street with new roofs is a street with gutter work, painting and, shortly, solar quotes.
Why home projects cluster
If home improvement were spread evenly, every neighborhood would have a few permits and no chart would be worth drawing. It is not, and the reasons are worth understanding, because they tell you where the work will be next year as well as this month.
Houses age together. Most neighborhoods were built over a few years by a few builders, with the same roofing, the same air conditioning units and the same water heaters. Those parts wear out on roughly the same schedule. So replacements arrive in waves, street by street.
Builders work where the land is. New homes can only go where there are lots. That pulls new-home permits, and everything that follows a new home, into a small number of areas at any one time.
Sales trigger spending. People tend to do the big jobs soon after they buy: the fence, the kitchen, the pool they promised the children. A neighborhood where a lot of houses are changing hands will show it in permits a little later.
Neighbors copy neighbors. One new pool on a street makes the next one easier to justify. Every contractor who has put a yard sign up knows this.
Weather does not respect property lines, but damage does. A storm that hits one side of the city harder can show up as a burst of roof permits there in the months after.
None of these is unique to Orlando. Together they mean a short list of neighborhoods carries a large share of the work at any moment, and the list changes slowly enough to plan around.
What kind of work is being done
The six kinds of permit are very different in volume and in size. Volume first.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
And the typical size of the job, as stated on the permit by whoever applied for it.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Put the two together and you can see the trade-off each list makes. Some are many small jobs; some are few large ones. Neither is better. It depends whether you sell a $200 service or a $20,000 project.
Pools
A pool is a big, optional spend, so pool permits point to households with room in the budget and room in the yard. They also change the whole back garden: decking, fencing, screening, planting and lighting all get decided around the same time.
Who should look here: pool service companies, for the finished ones. Fence and screen-enclosure companies, pavers and landscapers, for the ones just filed.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Roofs
Roofs are about age. Houses built in the same few years tend to need new roofs in the same few years, so when one street starts re-roofing it is worth looking at the streets around it. Roofs are usually the largest list, which makes this the steadiest chart on the page from month to month.
Who should look here: gutter and solar companies, exterior painters, and insurance agents, since a new roof is one of the things insurers ask about.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
New homes
New homes show you where the city is growing. They concentrate where builders still have land, so the same few areas can lead this chart for months, then drop away once a community is built out.
Who should look here: landscapers, fence companies, blinds and shutters, pest control, movers, and any subcontractor who wants to work for the builders named on the permits.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Fences
A fence is often one of the first things a new owner does. If you sell anything for the yard, a fence permit is an early sign that the yard is getting attention. The numbers are smaller than for roofs, so expect this chart to move around more.
Who should look here: landscapers, sod and irrigation companies, and pet services.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Remodels
Remodels turn up where people are choosing to improve the house they have. The work varies a lot, from a single bathroom to a whole floor, so check the job value on each one before you decide it is worth a visit.
Who should look here: flooring, cabinets and countertops, painters, dumpster hire while the work is under way, and cleaners when it finishes.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
AC replacements
AC replacements follow the same logic as roofs: systems installed around the same time wear out around the same time. In Orlando nobody leaves a dead one for long.
Who should look here: insulation and duct-cleaning companies, smart-thermostat installers, and anyone selling a maintenance plan.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
Who is doing the work
The neighborhood tells you where. The contractor column tells you who. These are the companies named on the most roof permits in the city over the last 30 days, taken straight from the public record.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
And the builders named on the most new-home permits.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
If you are a subcontractor or a supplier, this is a prospect list. If you compete with these companies, it is a view of who is winning work and where. If you are a homeowner, it is a reminder that the contractor on your permit is a matter of public record, which is one reason to check that yours pulled one.
Is building speeding up or slowing down?
Thirty days tells you where. Twelve months tells you which way things are heading. New-home permits are the best single gauge of that, because builders file them months before anyone moves in.
See the numbers
| Month | Permits |
|---|---|
| Nov 2025 | 50 |
| Dec 2025 | 89 |
| Jan 2026 | 92 |
| Feb 2026 | 80 |
| Mar 2026 | 54 |
| Apr 2026 | 86 |
| May 2026 | 109 |
| Jun 2026 | 111 |
| Jul 2026 | 81 |
| Aug 2026 | 89 |
| Sep 2026 | 107 |
| Oct 2026 | 91 |
City of Orlando permit records, Nov 2025 to Oct 2026, counted by the month the city processed the application.
Pools are the other one worth watching, since a pool is the clearest sign of a household with money to spend on the property.
See the numbers
| Month | Permits |
|---|---|
| Nov 2025 | 23 |
| Dec 2025 | 19 |
| Jan 2026 | 33 |
| Feb 2026 | 33 |
| Mar 2026 | 35 |
| Apr 2026 | 24 |
| May 2026 | 27 |
| Jun 2026 | 24 |
| Jul 2026 | 26 |
| Aug 2026 | 23 |
| Sep 2026 | 22 |
| Oct 2026 | 33 |
City of Orlando permit records, Nov 2025 to Oct 2026, counted by the month the city processed the application.
A year of permits by type
Thirty days can be an odd month. For a steadier picture, this is every residential building permit the city processed over the last 12 full months, by the kind of work. It includes types we do not offer as lists, such as additions and accessory structures.
City of Orlando permit records, Nov 2025 to Oct 2026. Electrical, plumbing and mechanical permits are separate and not counted here.
How we count
- Included
One- and two-family homes
Residential permits in six categories, inside the City of Orlando’s limits.
- Included
Filed and finished
A permit counts if the city processed it or closed it in the last 30 days. Each permit is counted once.
- Left out
Commercial and apartments
Shops, offices and buildings with three or more homes are not counted.
- Left out
Work without a permit
Painting, flooring and most small repairs never appear in permit records.
Two cautions. Neighborhood names are the city’s own and are attached to each permit by the city; a few permits have none and are left out of the neighborhood charts. And job values are what the applicant wrote down, which is an estimate and sometimes blank.
If you want to check our numbers or cut the data a different way, you can. Our guide to the Orlando permit search shows how to pull the same records from the city for free.
What these charts cannot tell you
We would rather you trusted these numbers for the right reasons, so here is what they leave out.
- Work done without a permit. Some of it never needed one. Some of it should have had one and did not. Either way it is invisible here.
- Anything outside the city limits. Much of what people call Orlando is unincorporated Orange County or another city. A quiet bar on this page says nothing about a neighborhood a mile over the line.
- What a job really cost. The value is the applicant’s estimate, written before the work started. Some are careful. Some are round numbers. Some are blank.
- Whether a neighborhood is “up and coming”. Permits measure activity, not prices or desirability. Plenty of activity is repair.
- The neighborhood names you use. The city’s names do not always match the ones on real estate sites or the sign at the entrance, and a few permits have no neighborhood at all.
How fresh the numbers are
The City of Orlando updates its published permit data daily. We read it and hold each result for up to an hour, so the 30-day charts on this page are never more than about an hour behind the city’s own records. The 12-month charts change slowly, so we refresh those once a day.
The city sometimes posts a record a few days after the date written on it. That means the most recent few days are always slightly undercounted and fill in later. It is another reason to read these as a picture of the month and not of the week.
If the city’s feed is down when you load the page, a chart says so in place of numbers. We would rather show a gap than a stale figure.
How to use this
- Pick where to advertise. A yard sign, a mailer or a sponsored Little League team does more in a neighborhood where people are already hiring.
- Plan your routes. If two of the top neighborhoods for your trade sit next to each other, that is a day’s work without crossing the city.
- Spot the next one early. A neighborhood that appears in the top twelve for the first time is worth a drive round before your competitors notice.
- Then get the addresses. A chart tells you which neighborhood. It does not tell you which house. That is what permit leads are for.
A Monday-morning example
Here is how a small company might use this page in ten minutes at the start of the week. Take a fence and sod business with one crew.
- Open the fences chart. Note the top three neighborhoods. Then open the new-homes chart and note its top three. Where a name appears on both, that is where owners are moving in and enclosing their yards at the same time.
- Compare with last week. If the same neighborhood has been near the top for a month, it is a steady source and worth a yard sign and a regular day. If it has only just appeared, it may be one builder closing out a phase.
- Check the map in your head. Are two of those neighborhoods close together? Then Tuesday and Wednesday are spoken for, and the crew is not crossing the city between jobs.
- Decide what to ignore. This is the step that makes the difference. A neighborhood with two permits on the far side of town is not an opportunity this week, however good the jobs look.
- Then get the addresses. The chart has done its job. From here you need the actual homes, which means the city’s records or a list.
The point is not the chart. It is that you made the week’s decisions before the phone started ringing, using what the city recorded and not what you happened to drive past.
Not a contractor? Other ways to use this page
We built this for trades, but permit activity is useful to anyone whose work depends on what homeowners are doing.
- Real estate agents can talk about a neighborhood with something better than adjectives. The number of roofs replaced or homes remodeled nearby is a fact a buyer can use.
- Suppliers and rental yards can decide where to stock and where to send a rep. Dumpsters, scaffolding, pavers and sod all follow the permits.
- Insurance agents can watch roof and AC replacements, since the age of both matters when a house is insured.
- Homeowners can see whether the whole street is being re-roofed, and whether it is worth getting a quote while crews are nearby.
- Local reporters and neighborhood groups get a quick, sourced answer to “what is going on around here?”.
Whatever you use it for, the source is the city’s own record, and you are welcome to quote the charts with a link back to this page.