Anyone working out how to get lawn care customers runs into the same odd problem, and landscapers share it. Almost every house is a possible customer, which means almost none of them are a good lead. You can drive down any street in Orlando and see twenty lawns that could use you. Nineteen of the owners are not thinking about it this year.

So the useful question is not “who has a yard?”. It is “whose yard is about to change?”. The city’s permit records answer that, three different ways.

The three permits that point to a yard job

Three permits, three kinds of yard workEach is a list we follow every morning in the City of Orlando.
  • New homes

    Sod, plants, irrigation, trees

    A finished house on a graded lot. The builder does the minimum and the owner wants more.

  • Pools

    Re-sod, replant, repair irrigation, add beds

    Machinery has been through the back yard. Whatever was there is gone.

  • Fences

    Planting along the line, sod repair

    A new fence changes how the yard is used and usually leaves a strip of bare ground.

Here is how those three compare with the other kinds of permit we follow, over the last 30 days.

Leads by trade in Orlando, last 30 daysPermits just filed plus permits just finished, one- and two-family homes.
  1. Roofs203 filed, 180 finished383
  2. New homes111 filed, 70 finished181
  3. AC replacements86 filed, 75 finished161
  4. Remodels36 filed, 45 finished81
  5. Fences37 filed, 19 finished56
  6. Pools25 filed, 21 finished46

City of Orlando permit records, Oct 30 to Nov 29, 2026.

New homes: a bare lot and a new owner

Every new house ends the same way: a certificate of occupancy, a moving truck, and a yard with builder-grade sod and three shrubs. Some buyers are happy with that. Plenty look at it for a month and decide it needs trees, a proper bed along the front, maybe a paver path to the side gate.

That makes a new home two leads in one. During the build, somebody has to lay that first sod and install irrigation, and the builder chooses who. After the sale, the owner chooses everything else.

This is how many new-home permits the City of Orlando has processed each month over the last year.

Orlando new home permits filed each month1,039 in the last 12 full months. Oct 2026: 91.
See the numbers
MonthPermits
Nov 202550
Dec 202589
Jan 202692
Feb 202680
Mar 202654
Apr 202686
May 2026109
Jun 2026111
Jul 202681
Aug 202689
Sep 2026107
Oct 202691

City of Orlando permit records, Nov 2025 to Oct 2026, counted by the month the city processed the application.

And these are the builders pulling the most of them right now. If you want subcontract work, this is the list of people to call. They are named on the public record because they are the ones applying.

Contractors with the most Orlando new home permits, last 30 daysAs named on the city’s permit records. Two permits or more.
  1. PULTE HOME COMPANY LLC41
  2. TOLL BROS INC26
  3. DREAM FINDERS HOMES LLC20
  4. TOLL BROTHERS INC19
  5. MATTAMY ORLANDO LLC19
  6. HOME ENERGY GROUP LLC, D/B/A ARCXIS6

City of Orlando permit records, Oct 30 to Nov 29, 2026.

Pitching a builder for subcontract work

Builder work is not for everyone. The margins are thinner than retail, the schedule is theirs and not yours, and you get paid on their terms. What you get in return is volume you can plan around: the same crew, the same streets, week after week. If that suits your business, the permit records hand you a prospect list that is hard to get any other way.

A few things that help when you make the call.

  • Ask for the right person. Not the sales office. You want whoever runs construction or buys trades for that community. The site superintendent on an active street is often the fastest way to find out who that is.
  • Lead with reliability, not price. A common builder worry is a house that cannot close because the sod is not down. If you can say “we finish within two days of the call, every time”, say that first.
  • Have your paperwork ready. Proof of insurance, your business tax receipt and references from other builders. They will ask, and having it on the first call sets you apart.
  • Know their volume before you ring. “I see you have filed for a number of homes in the same neighborhood this month” shows you have done your homework. The permit records are where you get that from.
  • Start with one street. Offer to take a single phase and prove yourself. It is an easier yes than replacing their current landscaper outright.

And remember the second sale. Every house you sod for a builder is about to have a new owner, and you already know the soil, the irrigation layout and the address. A door hanger on closing week that says “we installed your lawn, here is how to look after it” is the warmest introduction you will ever get.

New pools: the yard gets rebuilt

A pool does not get built without wrecking the back yard. There is an access route for the excavator, a pile of spoil, trenches for plumbing and electrics, and usually a cut irrigation line or two. When the pool is finished the owner has a beautiful pool surrounded by mud.

Pool owners are also, by definition, people who spend money on their outdoor space. If you do design work, planting or lighting as well as lawns, this is the list where bigger jobs come from. The moment is early: get in front of them while the pool is still being built, because the planting plan gets decided along with the deck. We go deeper on pool timing in pool service leads in Orlando.

New fences: a small job that opens a bigger one

Fence permits are the least glamorous of the three and the easiest to win. The job is small: a strip of disturbed ground, a few plants to soften the new line, sometimes sod repair where the crew worked. But it is quick, it is right after the fence goes up, and a homeowner who has just fenced the yard is often part-way through a longer list. A dog, a play set, a garden. Be the person who did the first bit well.

This is how many fence permits the city has processed each month over the last year.

Orlando fence permits filed each month466 in the last 12 full months. Oct 2026: 29.
See the numbers
MonthPermits
Nov 202537
Dec 202529
Jan 202638
Feb 202644
Mar 202637
Apr 202639
May 202640
Jun 202648
Jul 202636
Aug 202638
Sep 202651
Oct 202629

City of Orlando permit records, Nov 2025 to Oct 2026, counted by the month the city processed the application.

Reading a permit like a landscaper

A permit record is five or six facts. Each one tells you something about the yard job before you have seen the yard.

  • The job value. A guide to the household’s budget and the scale of the project. An expensive pool or a high-value new home suggests an owner who will pay for design, not just sod.
  • The owner. A person’s name means a homeowner decision. A company name on a new home means the builder still owns it, and your conversation is with the builder.
  • The contractor. Tells you who is on site. If you already work with that builder or pool company, you have an introduction.
  • The neighborhood. Tells you whether the job fits your route, and what the lots and the homeowners’ association are like.
  • The date and the stage. Filed means the work is ahead. Finished means the contractor has left and the yard is as they left it.

For a sense of scale, this is what new-home permits in Orlando look like on the value line.

How big Orlando new home jobs areJob value as written on the permit by the applicant. An estimate, not a contract price.
typical (median) job value
$213,920
total across the month
$47,997,201
permits that state a value
181 of 181

City of Orlando permit records, Oct 30 to Nov 29, 2026.

Which list suits which kind of landscaper

“Landscaping” covers businesses that have very little in common. A two-person mowing crew and a design-build firm do not want the same lead. Here is how we would match the three lists to what you actually sell.

  • Sod and installation crews. New homes, filed. Your customer is the builder, your selling point is turning up when you said you would, and the volume is in whichever communities are under way this year.
  • Irrigation specialists. Finished pools and finished fences. Both jobs cut through existing lines, and the homeowner often does not find out until a zone stops working. A card that says “new pool or fence? Have your sprinklers checked” names a problem they are about to have.
  • Design and planting. Pools, filed, and new homes, finished. These are the owners with a budget and a blank space. Get in before the deck is poured if you can, because that is when the layout is still open.
  • Maintenance and mowing. New homes, finished. A new owner has no lawn service yet, exactly as a new pool owner has no pool service. It is the one moment a maintenance company is not trying to take the account off somebody else.
  • Trees. New homes, finished. Builder lots tend to come with very little shade, and in Florida that is felt in the first summer.
  • Pavers, lighting and outdoor living. Pools, filed. The pool is the centre of a larger plan and the owner is already talking to contractors about it.

If you do several of these, resist sending one card that lists them all. Pick the one thing that fits the permit and lead with that. You can mention the rest when you are standing in the yard.

When to get in touch

Each of the three has a different clock.

When a landscaper should make contactFiled means the city has processed the application. Finished means the permit is closed.
  1. New home, filed

    Talk to the builder

    The owner on record is often the builder at this stage. This is a subcontract conversation, not a homeowner one.

    Good moment for sod and irrigation crews who want volume work.

  2. New home, finished

    Talk to the new owner

    The house is done and about to be lived in. A welcome postcard lands at the right moment.

    Good moment for design, planting, trees and maintenance.

  3. Pool, filed

    Get into the plan early

    The yard is about to be dug up and the owner is deciding what goes around the pool.

    Good moment for landscape design, pavers, lighting.

  4. Pool or fence, finished

    Fix what the build left behind

    Bare ground, broken sprinkler heads, a new fence line with nothing along it.

    Good moment for sod, irrigation repair, planting.

Where to concentrate

A landscaping crew makes money when the truck stays in one area. A list of forty addresses across the whole city is forty drives. The same forty in three neighborhoods is a week’s work with a yard sign on every corner.

These are the neighborhoods with the most new-home permits in the last 30 days.

Orlando neighborhoods with the most new home permits, last 30 daysFiled and finished permits, counted once each.
  1. Lake Nona South71
  2. Vista Park32
  3. Meridian Park30
  4. College Park10
  5. Southeastern Oaks9
  6. Colonialtown North5
  7. Sunbridge/ICP4
  8. Timberleaf3

City of Orlando permit records, Oct 30 to Nov 29, 2026.

Pick the two that are closest to where you already work and start there. We keep the full picture, for every kind of permit, in Orlando permits by neighborhood.

What to send

A new homeowner is getting a lot of mail. Most of it is generic: window cleaning, pest control, a pizza menu. Yours can be about their actual house, which is the whole advantage of working from a permit.

A first postcard for a new homeAn example of the wording. Use your own name, area and offer.

Put a photo of a yard you actually did on the front, ideally one nearby. A real before and after from the same neighborhood does more than any sentence you can write.

If you prefer to knock, remember that Orlando requires a solicitor’s permit for door-to-door selling. Here are the rules.

These are real new-home permits from last week’s Orlando records.

Know the watering rules before the owner asks

One of the first questions a new homeowner asks about a lawn in Central Florida is “how often can I water it?”. If you can answer it properly you sound like the expert in the conversation, because most people selling to them cannot.

Lawn watering here is restricted by the water management district. The St. Johns River Water Management District, which covers a large part of Central Florida, currently allows landscape irrigation on two set days a week during daylight saving time and one day a week during Eastern Standard Time. The days depend on whether the house number is odd or even, and watering is not allowed between 10 a.m. and 4 p.m.

Rules tighten during droughts, and some addresses fall under a different district, so check the district’s current restrictions for the address before you quote them to a customer. Then build it into what you offer: set the irrigation timer to the legal days for them, and leave a card on the controller saying which days those are. It is a small thing, and it is the kind of small thing people tell their neighbors about.

A follow-up calendar for a new-home lead

A new homeowner is not ready to buy landscaping in the week they move in. They are unpacking. The yard becomes a project a little later, and the landscaper who is still in front of them at that point gets the call. So plan more than one touch.

Four touches over the first few monthsA simple schedule for one new-home address. Adjust the gaps to suit your trade.
  1. Week the permit finishes

    A welcome postcard

    Short and friendly. Who you are, that you work nearby, and a free walk-round.

  2. About three weeks later

    A second card with a photo

    A real before and after from the same neighborhood. This is the one that gets kept.

  3. When you are next on the street

    A hello in person

    With a city solicitor’s permit if you are knocking. Otherwise a wave and a card over the fence.

  4. Before the next growing season

    A seasonal offer

    By now they have lived with the builder’s yard and know what they dislike about it.

Four touches sounds like a lot until you remember what one landscaping customer is worth over the years they stay in the house. Keep a note against each address so you know which touch is next.

Pulling these lists yourself

All three lists can be pulled from the City of Orlando’s open data site for free. In the Permit Applications dataset, filter plan_review_type to “Residential 1/2” and application_type to “Building Permit”, then set worktype to “New” for new homes or “Fence” for fences. Pools are simply worktype “Pool”. Add a date filter on final_date for finished jobs or processed_date for newly filed ones.

Our Orlando permit search guide walks through it step by step, with a weekly spreadsheet routine. What the city’s data will not give you is the owner’s mailing address or a map, which is the part we add.

Mistakes to avoid

  • Mailing the builder’s office about a homeowner job. While a new home is under construction the owner on record is often the builder. Wait for the permit to finish before you write to “the new owner”.
  • Treating all three lists the same. A fence is a quick, small job. A pool yard is a design conversation. Use different cards.
  • Quoting from the street. New-build lots hide surprises: compacted fill, buried debris, irrigation that was never finished. Walk the yard before you name a price.
  • Ignoring the homeowners’ association. Many new neighborhoods have rules on what can be planted and where. Ask before you design.
  • Spreading out. Ten jobs in one neighborhood build a reputation. Ten jobs in ten neighborhoods build a fuel bill.

What this will not do

  • It will not find mowing customers on established streets. Permits only show homes where something is being built. For plain maintenance work on older houses, referrals and signs are still your best tools.
  • It will not give you a phone number. You get the address and, as a subscriber, the owner on record. Contact is by mail or in person.
  • It will not cover the suburbs. A lot of new building is outside the city limits, in unincorporated Orange County and beyond. These lists are the City of Orlando only.

Within those limits, it does one thing well: it tells you, every morning, which yards in the city are about to change. What you do with that is the part that takes a landscaper.

See this month’s Orlando new home permit leads