Most of what gets sold as a contractor lead is a guess, and it is not cheap. Building permits are the opposite: a free, public record of real projects. First, the guess. Somebody clicked an ad, typed a phone number into a form and may or may not remember doing it. You pay for the guess, and so do three of your competitors.

A building permit is a different kind of thing. It means a homeowner has already decided to spend money on their property, hired someone and told the city about it. The project is real, the address is real and the date is on the record. This guide explains how local trades turn that into construction leads they do not pay for one at a time, with numbers from Orlando, because Orlando is the city we know.

What a building permit lead is

When someone builds a pool, replaces a roof, puts up a fence or remodels a kitchen, the work usually needs a permit from the city. The application goes on the public record: the address, what the work is, what it is expected to cost and which contractor is doing it.

A building permit lead is that record, read by someone who sells what comes next. The pool builder is not your customer. The family who will own a pool in three months, and has never owned one before, is.

Here is what the city posted in Orlando over the last 30 days, across the six kinds of permit we follow.

Leads by trade in Orlando, last 30 daysPermits just filed plus permits just finished, one- and two-family homes.
  1. Roofs203 filed, 180 finished383
  2. New homes111 filed, 70 finished181
  3. AC replacements86 filed, 75 finished161
  4. Remodels36 filed, 45 finished81
  5. Fences37 filed, 19 finished56
  6. Pools25 filed, 21 finished46

City of Orlando permit records, Oct 30 to Nov 29, 2026.

What gets a permit, and what does not

It helps to know what the permit office actually sees, because that is the edge of the map. Broadly, a permit is needed when work changes the structure of a house, adds something to the lot, or touches the roof, the electrics, the plumbing or the air conditioning. Cosmetic work is not.

So a new roof, a pool, a fence, an addition, a gutted kitchen and a replacement AC system all leave a record. A repaint, new flooring, a deep clean and a new lawn do not. That sounds like bad news if you are a painter or a flooring company. It is the opposite. The permit is how you find out that a house is mid-project, and your work is the part the permit does not cover.

This is what one- and two-family homes in Orlando pulled building permits for over the last 12 full months. The words in quotes are the city’s own codes, which you will need if you ever search the records yourself.

What Orlando homes pull building permits forBuilding permits on one- and two-family homes in the last 12 full months, by the city’s work type.
  1. Roofsworktype “Roof”2,535
  2. Repairsworktype “Repair”1,404
  3. New homesworktype “New”1,039
  4. Remodels (alterations)worktype “Alteration”584
  5. Fencesworktype “Fence”466
  6. Poolsworktype “Pool”314
  7. Accessory structuresworktype “Accessory”181
  8. Additionsworktype “Addition”119

City of Orlando permit records, Nov 2025 to Oct 2026. Electrical, plumbing and mechanical permits are separate and not counted here.

Look at how the list is ordered rather than at any one number. The kinds of work near the top are the steady, year-round sources of leads. The ones near the bottom are real but thin, and a business cannot live on them alone.

Why a permit beats a form-fill

Three reasons, and none of them is clever.

The money is already committed. A homeowner with a filed pool permit is not thinking about maybe getting a pool. They have signed a contract. People in the middle of a project spend on the things around it, and they do it fast.

You know what they need before you speak. A finished roof means gutters are about to go back on. A new home means a bare yard. You are not opening with “do you need anything?”. You are opening with the thing they are about to go looking for.

You are not paying for it one lead at a time. The record is public. Whether you check it yourself or pay someone a flat price to send it, nobody is charging you per name, and nobody is selling the same phone call to four companies.

Filed and finished: the two moments that matter

Every permit has two dates worth caring about. The day the city processes the application, and the day the city closes it as finished. Different trades want different ends of that line.

The life of a permit, and who should be paying attentionHow long each stage takes depends on the job. A fence can be days; a new home is months.
  1. Stage 1

    Permit filed

    The owner has signed with a contractor and the city has the application.

    Good moment for trades that work alongside the build: fencing and pavers for a pool, flooring and cabinets for a remodel.

  2. Stage 2

    Work under way

    Inspections happen. The owner is living with a building site and making decisions weekly.

    Good moment for suppliers, dumpsters, and anyone the main contractor does not cover.

  3. Stage 3

    Permit finished

    The city has signed the job off. The contractor leaves.

    Good moment for service trades: weekly pool care, gutters after a roof, cleaning after a remodel, landscaping after a new home.

  4. Stage 4

    The first month after

    The owner sets up the routines that will last for years. After this, somebody else has the account.

    Good moment for anyone selling a recurring service. This is the window.

If you sell a one-off job that happens during the build, you want filed. If you sell an ongoing service, you want finished. Plenty of trades want both, a postcard at filing and a knock at finishing.

Which permits suit which trades

The trick is to stop looking for permits in your own trade. A roofer gains little from roof permits, because a roof permit means another roofer already has the job. Look one step downstream.

Six kinds of permit, and who they are leads forEach links to this month’s live Orlando numbers.
  • Pools

    Pool service, pavers, fencing, screen enclosures, landscaping

    A new pool changes the whole back yard and starts a weekly service need.

  • Roofs

    Gutters, solar, exterior paint, insurance agents

    A new roof is the natural moment for everything attached to it.

  • New homes

    Landscaping, fencing, blinds, pest control, movers

    An empty house and a bare lot, with an owner about to move in.

  • Fences

    Landscaping, sod, irrigation, pet services

    A fence usually means the yard is next, and often a dog.

  • Remodels

    Flooring, cabinets, countertops, paint, dumpsters, cleaning

    Filed remodels need materials. Finished ones need the mess gone.

  • AC replacements

    Insulation, duct cleaning, smart thermostats, maintenance plans

    An owner who just spent on comfort is open to protecting it.

Job size varies a lot between these. Below is the typical value written on the permit for each kind, from Orlando’s records. It is the applicant’s own estimate, so treat it as a guide to the size of the project and the household, not a quote.

Typical job value on the permit, by tradeThe middle value (median) of the permits that state one. It is the applicant’s estimate, not a contract price.
  1. New homes181 of 181 permits state a value$213,920
  2. Pools46 of 46 permits state a value$64,398
  3. Remodels80 of 81 permits state a value$15,900
  4. AC replacements151 of 151 permits state a value$11,515
  5. Roofs347 of 347 permits state a value$9,680
  6. Fences54 of 54 permits state a value$3,553

City of Orlando permit records, Oct 30 to Nov 29, 2026.

What is inside one lead

People are sometimes surprised by how much is on a permit, and by what is missing. This is a real one from last week’s Orlando records, taken apart.

What is in one permit leadA real pool permit from last week’s free sample. Subscribers also see the owner on record and property facts.
  1. 10401 MEDAWAR ST

    The property address. This is where the work is.

  2. Lake Nona South · Finished Nov 19, 2026

    The neighborhood and the date the city filed or closed the permit.

  3. Job value: $155,800

    The applicant’s own estimate of the job. A rough guide to the size of the project.

  4. Contractor: POOLS BY BRADLEY INC

    Who pulled the permit. Useful if you sell to builders as well as owners.

  5. Permit BLD2025-20030

    The city’s reference. Type it into the city’s lookup to check the record yourself.

City of Orlando permit records. Owner names are never shown on this website.

Orlando’s records also name the property owner. We send that to subscribers and keep it off this website. What no permit has is a phone number or an email address. That shapes everything about how you follow up.

Who you are actually writing to

“The owner” is not always a family at the kitchen table. Before you write a postcard, look at who the record names, because there are three quite different people it could be.

An owner who lives there. The common case and the easy one. The property address and the mailing address are the same, and the county has the house down as their main home. Write to them as a neighbor would.

An owner who lives somewhere else. A landlord, a second home, a house bought to renovate and sell. The mail needs to go to their mailing address, not the property, or it lands on a tenant’s doormat. For a recurring service these can be good customers, because the owner is not there to do the job themselves.

A company. On new homes especially, the owner on record during the build is often the builder. That is not a homeowner lead at all. It is a business that might need a subcontractor, and it wants a different conversation: price, schedule and proof of insurance.

You can work most of this out yourself from the county property appraiser’s website, one address at a time. We add it to each lead for subscribers: the owner’s mailing address when it differs from the property, whether the house is claimed as a main home, the year it was built and the last sale. That information comes from the state’s public property roll and can be up to a year old, so a house that has just changed hands may still show the previous owner.

How to make first contact

You have an address and a reason. That points to two channels, and they work well together.

Mail. A postcard that names the project does the job a cold call never will. “Congratulations on the new pool. We look after 40 pools in Lake Nona and we’d like to look after yours” is specific, local and true. Send it within a few days of the permit, not a few weeks.

The door. For recurring services, a short, polite knock from the person who would actually do the work is hard to beat. You need to do it by the book in Orlando, which means a permit from the city before you start. We wrote up the rules here.

The neighbors. One new roof on a street of 1990s houses tells you something about the other roofs on that street. A permit is a lead and a map pin. Work the block, not just the address.

Whatever you do, keep a list. Who you mailed, who you spoke to, who said “come back in March”. The companies that get value out of permits are rarely the ones with the best postcard. They are the ones who follow up.

A worked example: one week of roof permits

Say you run a gutter company with two crews. Here is what using permits looks like in an ordinary week. Nothing in this example is a result we are promising. It is the routine.

  1. Monday morning. You pull the roofs the city marked as finished in the last seven days. A re-roof is the natural moment to replace tired gutters, and the owner already has the ladder money out.
  2. Sort by neighborhood. You are not going to work forty addresses spread across the city. You pick the two or three neighborhoods with the most finished roofs and ignore the rest this week.
  3. Mail the same day. One postcard: “New roof? We fit gutters in your neighborhood.” Your name, your license number, your phone.
  4. Drive the streets on Thursday. A crew is working nearby anyway. Ten minutes down each street tells you which houses have bare fascia and which already have new gutters. Cross the second lot off.
  5. Look at the neighbors. Houses on the same street were often built in the same few years. If several have re-roofed, the rest may not be far behind, and nobody has mailed them yet.
  6. Write it down. Mailed, replied, quoted, won. Every address, every week.

These are the neighborhoods where that routine would start right now.

Orlando neighborhoods with the most roof permits, last 30 daysFiled and finished permits, counted once each.
  1. Vista Park37
  2. College Park30
  3. Meridian Park30
  4. Lake Nona South15
  5. Airport North12
  6. Southeastern Oaks10

City of Orlando permit records, Oct 30 to Nov 29, 2026.

How to tell whether it is working

We are not going to quote you a response rate. Anyone who does is guessing, because it depends on your trade, your offer, your price and how fast you move. What we can give you is the sum to do with your own numbers after a month.

  • Leads worked. How many addresses you actually mailed or visited. Not how many were on the list.
  • Conversations. Calls, texts and doorstep chats that came from them.
  • Quotes. How many of those turned into a price.
  • Jobs, and what they were worth. For a recurring service, count the first year, not the first visit.

Add up what you spent: the list, the postcards, the stamps, the hours. Divide by jobs won. That is your cost to win a customer from permits, and you can put it next to what a referral or a paid lead costs you. Give it at least two months before you judge it. The first month is mostly learning which permits and which words work for you.

What it costs

If you do it yourself, it costs time: a check every morning, a filter, and a look-up for each owner. If you pay for it, a flat-price service turns into a very small number per lead, because the city posts a lot of permits. Here is the arithmetic for pools in Orlando, using last month’s real count.

What an Orlando pool lead works out atThe flat monthly price divided by the leads the city actually posted. Your month will differ.
pool leads in the last 30 days
46
flat price for the month
$49
per lead, worked out
$1.07

City of Orlando permit records, Oct 30 to Nov 29, 2026. Price: $49 a month for one list.

Compare that with what you pay per lead elsewhere, and remember that none of these were sold to anyone as an “exclusive” form-fill. They are simply every pool the city recorded.

How permits compare with other ways to get work

Permits are one channel. Most healthy trade businesses run three or four, so it is worth being clear about what each is good for.

Referrals are the best customers you will ever get, and you cannot turn them up. They arrive when they arrive. A business that lives only on referrals grows at the speed of its customers’ dinner parties.

Pay-per-lead sites give you a homeowner who has asked for a quote, which is a stronger signal than a permit. The catch is that the same request often goes to several companies, and you pay for the lead whether or not you win the job.

Search and ads catch people at the moment they go looking. They work, they take time to build, and in a big metro area you are competing with companies that have far larger budgets.

Permits sit in a different place. The homeowner has not asked for you, so you have to start the conversation. In return you know about the project before they have gone looking for the next trade, the cost does not depend on how many leads there are, and the list is the whole market rather than the slice that clicked an ad. It suits businesses that are willing to do a little outreach every week. It does not suit a business that wants the phone to ring by itself.

Where permit leads fall short

We sell these, so here is the part a sales page would leave out.

  • No phone numbers. If your whole sales process is outbound calls, permits will not feed it without extra work.
  • Not every job needs a permit. Painting, flooring and a lot of small repairs never touch the permit office. You only see the projects that do.
  • Records can be late or wrong. The city sometimes posts a permit days after the date on it, and applicants make typos. Check the city’s record before you drive anywhere.
  • The owner is not always the person living there. Builders, landlords and companies own property too. A new home permit often names the builder until the sale closes.
  • Other companies can read the same record. It is public. Speed and a good first line are your edge, not secrecy.

Six mistakes to avoid

  1. Buying every list. Start with the one kind of permit closest to your trade. You will not work six lists properly.
  2. Waiting. A permit from six weeks ago is history. The value is in the week it appears.
  3. Writing about yourself. How long you have been in business is not why they will call. “You have a new pool” is.
  4. Mailing once. One card is easy to miss. A second, two or three weeks later, costs little and reaches the people who meant to call.
  5. Mailing the property when the owner lives elsewhere. Check the mailing address on anything that looks like a rental.
  6. Not keeping records. If you cannot say how many jobs came from last month’s list, you cannot decide whether to keep going.

How to start this week

You can try this without spending anything.

  1. Pick one kind of permit that sits just upstream of your trade. One, not six.
  2. Pull the last two weeks for it. Our Orlando permit search guide shows the free way, or you can have last week’s list emailed to you.
  3. Send ten postcards that mention the project by name. Ten, so you actually do it.
  4. Write down what happens. Then decide whether it is worth doing every week.

These are real Orlando pool permits from last week, the same ones the free sample sends.

See this month’s Orlando pool permit leads