People run a City of Orlando permit search for all sorts of reasons. You are buying a house and want to know if the roof was really replaced in 2019. Your neighbor is building something tall. You are a contractor and want to know who is working on your patch. Or, like our customers, you want a list of every home that just started a project.
All of it is public, and the city makes it easier than most. This guide walks through both of the city’s tools, what each column in the data means, and the gaps you should know about before you rely on it. We use this data every day, so we have run into most of them.
Why people look up permits
The reason you are searching decides which tool you want, so it is worth ten seconds.
- You are buying a house. The listing says “new roof” and “updated kitchen”. A permit record tells you whether the city ever heard about either, and when. Work done without a permit can become your problem after closing, and insurers and inspectors often want to know how old the roof really is.
- You own the house. You want to check that the contractor you paid actually pulled the permit and that it was closed out at the end, not left open.
- You live next door. Something is being built and you would like to know what it is and how tall.
- You are in the trades. You want to know where the work is, who is doing it, and which homes have just started or finished a project. That is a list question, not a single-address question.
The first three want one record. The fourth wants thousands. The city has a tool for each.
The two free tools
Both come from what most people call the Orlando building department. Its official name is the Permitting Services Division, and it sits on the first floor of City Hall at 400 South Orange Avenue (hours, numbers and how inspections work are in our guide to the Orlando building department). The two tools do different jobs, and picking the wrong one wastes an afternoon.
- One property
The permit lookup
Search by permit number, address, project name or parcel ID. Shows the status of that permit, its inspections and any fees. Best for checking a single house or job.
- Whole lists
The open data site
The Permit Applications dataset: every application, in a table you can filter, sort and export. Best for “show me every pool filed this month”.
Looking up one address or permit
Start at the city’s permits page, orlando.gov/permits, and open the permit lookup. The city says you can search it by permit number, address, project name or parcel ID. If a full address finds nothing, try less: just the house number and the street name, without the city or ZIP.
If you already have a permit number, from a yard sign, a contractor’s paperwork or one of our emails, use that instead. It is the one search that cannot match the wrong house.
One thing to know. The lookup is built for people who hold a permit. It is where fees get paid and inspections get booked, so it works one record at a time. That is fine for checking a house you are buying. It is slow going if you want every roof in College Park. For that, use the other tool.
Pulling a whole list from the open data site
The city publishes its permit applications on its open data site, data.cityoforlando.net. The steps below follow the city’s own instructions for viewing permitting data.
Step 1
Open the dataset
On the open data site, choose Permit Applications. It is one of the most used datasets there.
Step 2
Click “View Data”
The blue button at the top right opens the full table.
Step 3
Click “Filter”
Then “Add a New Filter Condition”. Add one condition at a time and watch the row count.
Step 4
Narrow it down
Filter by the kind of permit and by date. The next two sections show which columns to use.
Step 5
Click “Export”
Download what is left as a spreadsheet file and open it in Excel or Google Sheets.
The city’s own advice is worth repeating: if the table refuses to load, use fewer conditions or a longer window of time. The dataset is big, and stacking five filters at once can time it out.
The kinds of permit in the data
The first surprise when you open the dataset is its size. It holds more than a million rows, because it is not only building permits. Every kind of application the permitting office handles is in there, and one construction project produces several of them.
The application_type column tells them apart. The main ones are Building Permit, Electrical, Mechanical Permit (which covers air conditioning), Plumbing, Engineering, Fire Permit, Gas and Demolition Permit. There are also rows for impact fees and sewer fees, which are paperwork attached to a project and not a project in themselves.
That matters because a single new house can show up as a building permit, an electrical permit, a plumbing permit, a mechanical permit and a handful of fee records. If you count rows you will count the same house six times. Filter to one application_type first, always.
Within building permits, the worktype column says what the job is. This is how residential building permits in Orlando split over the last 12 full months.
City of Orlando permit records, Nov 2025 to Oct 2026. Electrical, plumbing and mechanical permits are separate and not counted here.
What the columns mean
The dataset has a lot of columns. These are the ones that matter, with a real value from last week next to each so you can see what the city actually writes.
| Column | What it tells you | Example |
|---|---|---|
permit_number | The city’s reference for the permit | BLD2025-20030 |
permit_address | Street address of the work | 10401 MEDAWAR ST |
application_type | The kind of permit | Building Permit, Mechanical Permit |
worktype | What the work is | Pool, Roof, New, Fence, Alteration, Repair |
plan_review_type | Homes or commercial | Residential 1/2, Residential 3 or more, Commercial |
processed_date | When the city processed the application | a date |
final_date | When the permit was closed as finished | Nov 19, 2026 |
estimated_cost | Job value, as the applicant stated it | $155,800 |
neighborhood | The city’s neighborhood name | Lake Nona South |
contractor_name | The company that pulled the permit | POOLS BY BRADLEY INC |
application_status | Where the permit stands | Finaled |
City of Orlando open data, Permit Applications dataset.
A few of these trip people up.
estimated_costof 0 does not mean a free job. It means the applicant left the box empty.worktype“New” only means a new house when the permit is a Building Permit on a residential property. On its own it catches every other kind of new work as well.worktype“SFR” looks like the right way to find single-family homes. In practice those rows are mostly engineering and impact-fee records, so one house shows up several times. We found that out the hard way.final_dateis blank until the job is signed off. Filter on it to find finished work.
Reading a permit’s status
The application_status column takes a small set of values. Looking at everything the city processed over the past year, almost all of it is one of two: Open or Finaled.
- Open means the permit is live. The work has been applied for and has not been signed off.
- Finaled means it passed its final inspection. This is the one to look for if you want to know a job is truly finished, and it goes with a date in
final_date. - Closed and Completed appear far less often. Both describe a permit that is no longer active.
- Hold and Hardhold are rare and mean the city has paused the application for some reason.
If you are a buyer and you find a permit for major work that is still Open years later, ask about it. An open permit can mean the final inspection never happened. The city’s Permitting Services Division can tell you what a status means for a particular record.
Filters that get you a clean list
These are the combinations we use ourselves for one- and two-family homes. Set them on the open data site exactly as written, then add a date condition on processed_date for newly filed permits or final_date for finished ones.
- Pools
worktype = Pool
Drop rows with a stated cost under $10,000 to lose the small repairs. Keep the rows where cost is 0.
- Roofs
worktype = Roof, plan_review_type = Residential 1/2
Leaves out apartment blocks and commercial buildings.
- New homes
worktype = New, plan_review_type = Residential 1/2, application_type = Building Permit
One row per new house.
- Fences
worktype = Fence, plan_review_type = Residential 1/2, application_type = Building Permit
Residential fences only.
- Remodels
worktype = Alteration, plan_review_type = Residential 1/2, application_type = Building Permit
Alterations to existing homes.
- AC replacements
worktype = Repair, plan_review_type = Residential 1/2, application_type = Mechanical Permit
System change-outs on existing homes.
A fifteen-minute weekly routine in a spreadsheet
If you want to do this by hand every week, this is the shortest version we know. It assumes Excel or Google Sheets.
- Save your filter once. On the open data site, set the filters for your kind of permit, then create a free account and save the view. Next week you open the saved view and skip straight to the date.
- Set the date to the last 14 days, not 7. Records arrive late. A two-week window with one week of overlap means nothing slips through.
- Export and open the file. Delete every column except the address, the two dates, the cost, the contractor, the neighborhood, the status and the permit number.
- Remove the ones you saw last week. Keep a running sheet of permit numbers you have already handled. A simple look-up against that sheet flags the repeats. This is the step people skip, and then they mail the same house twice.
- Sort by neighborhood, then by cost. The top of each neighborhood is your call list.
- Add the new permit numbers to your running sheet. Now you are ready for next week.
Fifteen minutes once you have done it a few times. The first run takes an hour, mostly spent working out which columns you can ignore.
For the technically minded: query it directly
The open data site runs on a platform that gives every dataset a web address you can query. You do not need this, but if you or someone you know is comfortable with a little code it saves all the clicking. The address for Permit Applications is:
https://data.cityoforlando.net/resource/ryhf-m453.json
Add a column name and a value to filter, for example ?worktype=Pool. Add $where for dates, $order to sort and $limit to cap the rows. A request for pools finished since the first of November looks like this:
?worktype=Pool&$where=final_date >= '2026-11-01T00:00:00'&$order=final_date DESC
Change .json to .csv and the same request downloads as a spreadsheet file. One thing we learned by trial and error: put the simple filters in as plain column=value pairs and keep $where for dates. Requests that pile text comparisons into $where sometimes get refused.
Finding out who owns the property
The dataset has two owner columns, property_owner_name and parcel_owner_name. The first is what was written on the application. The second is the owner of record for the parcel. They often match. When they do not, it is usually because the applicant was a builder or the house has since been sold.
Neither tells you where the owner gets their mail, which matters a great deal if the house is rented out. For that, look the address up on the Orange County Property Appraiser’s website. Its record for each parcel shows the owner, the mailing address, the year built and the sales history. It is free, and it is the same public record everybody else works from.
We do not publish owner names on this website or in our free sample. They go to subscribers only, next to each lead, and we will leave a name out for any owner who asks.
What you can learn once you have it
A list of permits is more than a list of addresses. Sort it and patterns fall out. Here are two we draw from the same data, live. First, new-home permits by month, which tells you whether builders in the city are speeding up or slowing down.
See the numbers
| Month | Permits |
|---|---|
| Nov 2025 | 50 |
| Dec 2025 | 89 |
| Jan 2026 | 92 |
| Feb 2026 | 80 |
| Mar 2026 | 54 |
| Apr 2026 | 86 |
| May 2026 | 109 |
| Jun 2026 | 111 |
| Jul 2026 | 81 |
| Aug 2026 | 89 |
| Sep 2026 | 107 |
| Oct 2026 | 91 |
City of Orlando permit records, Nov 2025 to Oct 2026, counted by the month the city processed the application.
Second, where the work is. The neighborhood column lets you count permits by area in a few clicks, which is how you decide where to put a yard sign or a second truck.
City of Orlando permit records, Oct 30 to Nov 29, 2026.
We keep a running version of this for every trade in Orlando permits by neighborhood.
What the city’s data will not tell you
Better to know these before you build a routine around it.
- No ZIP codes. The address column stops at the street. If you want to sort by ZIP you have to match each address against the county property roll.
- No map positions. To put permits on a map you need to convert each address yourself.
- No phone numbers or emails for owners. There is a phone column for the contractor, and nothing for the homeowner.
- Late records. A permit dated Monday can appear on Thursday. If you only look at “today”, you will miss things. Look back two weeks and keep track of what you have already seen.
- Typos. Contractor names are typed by hand. The same company can appear three ways.
None of this is a complaint. The city publishes far more than most, for free. It is just raw material, and the daily checking, de-duplicating and owner look-ups are where the hours go. That part is what we do for a living, and it is the honest pitch for paying for permit leads instead of pulling them yourself.
When the search does not work
These are the usual problems, and what fixes each one.
- Nothing comes back for an address you know is real. The usual reason is that it is not in the City of Orlando. See the next section.
- The table spins and never loads. Too many filters at once, or too short a date window on a huge table. Start with one filter and add the rest one at a time.
- You get far too many rows. You have not filtered
application_type, so every electrical and plumbing sub-permit is in there with the building permits. - A date filter returns nothing. Check which date you used.
final_dateis empty for every job that is still open, so filtering on it hides all work in progress. - The job value says 0. The applicant left it blank. It is not an error and the permit is real.
- The same house appears twice. A filed permit and a finished permit for the same job will both match a wide date window. Match on the permit number, which never changes.
If you are still stuck, the city’s Permitting Services Division is at 400 South Orange Avenue, and its contact details are on the city’s permitting pages. For anything that is not in the published data at all, the city’s advice is to file a public records request.
If the address is not in the City of Orlando
A lot of “Orlando” addresses are not in the City of Orlando. Much of the area is unincorporated Orange County, and places like Winter Park, Maitland and Belle Isle are their own cities with their own permit offices. If a search comes back empty, that is the usual reason.
To check, look the property up on the Orange County Property Appraiser’s website, which shows the municipality for every parcel. If it says Orlando, the city’s tools above are the right ones. If it says unincorporated, the permit will be with Orange County, which runs a separate online system called Fast Track. We cover that one in Orange County permit search.